Onshore Industrial Services – Barrow Spirit Energy

Industrial cleaning services during Spirit Energy’s largest onshore decommissioning project

Project Description

In 2018, Augean North Sea Services (ANSS) provided industrial cleaning services to Barrow’s South Morecambe Terminal during Spirit Energy’s largest onshore decommissioning project to date.

Augean North Sea Services (ANSS) were tasked with safely removing any residual sludges and cleaning 3 condensate tanks so that they would be ready for disconnection and subsequent demolition.

One of the tanks in particular, T-1602, presented a challenge to the crew due to over 350m3 of thick, contaminated fluids and sludge that coated the walls and floor. This sludge contained hydrocarbons and malodorous heavy iron sulphides, the removal and disposal of which required a safe and cost-effective solution to be provided by ANSS.

Solution

Firstly, the tank was drained of condensate and methanol-water mixture and separated on-site, providing a significant cost reduction. The tank was then jetted from the entry hatch to minimise the amount of work that had to be carried out utilizing confined space entry by the ANSS team.

Due to the hazardous waste, the decision was made to clean the interior as an inert entry. This type of entry avoids the potential for an explosive mixture to be created whilst jetting the hydrocarbon-entrained sludge by generating a nitrogen-rich atmosphere inside the tank. An ANSS Emergency Response Team was on hand throughout, monitoring and communicating with the cleaning crew. To ensure effective removal of all wastes ANSS worked wearing full PPE and breathing apparatus for extended periods inside the tank.

As a result, all three tanks were completed safely and successfully by the ANSS crew.

Project Overview

Project Name: Onshore terminal decommissioning project

Volume: 350m3 of contaminated sludge

Project Scope: Specialist Industrial Services

Project Highlights:

  • Augean provided Spirit with a solution that delivered the workscope with safety and competency as main focusses.

  • By separating the waste streams on-site, they were also able to provide a cost reduction to their client.

This has been a safely executed, high risk activity that was key to the continuing progress of the decommissioning project, through good communication and excellent One Team Working. The lessons learnt also provide the business with invaluable information, to take forward into key activities over the forthcoming months.

RELATED CASE STUDIES

Solar PV Installation – East Northants Resource Management Facility (ENRMF)

Clean up of foam filled warehouse

Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

contaminated land at Natara Global Hartlepool site

Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

New site set up for residue of APCr in Scotland

Setting up a new EFW site and transport for residue waste (APCr) in Scotland

Get in touch with our experts

Call us on 0333 034 9004 or 

Call us on
0333 034 9004 or

Contact Our Press & Media Team

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

GET IN TOUCH

CALL 0333 034 9004

Contact us about Onshore Industrial Services – Barrow Spirit Energy

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

Contact Onshore Industrial Services – Barrow Spirit Energy

Please include any relevant files or documents.
Max 5Mb / 5 attachments.