Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

Project Overview

Natara Global’s Hartlepool site has historic ground contamination associated with the Zinc and Sulphuric Acid plant that was previously on this land from the early 1900s until the late 1960s.

Following a number of projects on site a large quantity of contaminated land had been excavated and was being stored on a concrete pad on site.

To make space for future projects and site improvements Natara were looking for the contaminated soil to be removed within a short period of time.

The solution

Augean met with the customer and undertook site visits to assess the land and material during the negotiation period.

Routing the material the very short distance to Port Clarence, we evaluated the cost and managed all paperwork and processes in house for an easy transaction for Natara Global.

Over a 2 week period, Augean treated and disposed of over 5,000 tonnes of hazardous by metal sub soils.  The material was tested in 500-tonne batches and disposed of via the appropriate route, subject to the testing, to either stabilisation and mixed with other wastes at Port Clarence for recovery or disposal to hazardous landfill.

heavy contaminated soil Natara Global Hartlepool site
Heavy contaminated soils

A lot of time and effort goes into preparation and setting up of a new site, before the waste is even produced and received by Augean. From finance requirements to Consignment/SEPA notes. By getting the hauliers involved from the beginning, it helps to create a strong working relationship, encourages conversations, new ideas and improvements. It highlights the importance of working together and having a safe environment for all.

contaminated land at Natara Global Hartlepool site

Project Details

Project Name: Hazardous soils treatment and disposal to prepare land for future projects

Volume: 5,500 tonnes

Project Scope: Management, Storage, Treatment & Disposal of Material

Project Highlights

  • Ability to accept material over a short, tight time frame
  • Capability to administer all paperwork in-house
  • Daily flexibility to increase/decrease tonnage
  • Ensuring all material received is rigorously sampled
5,000 ton of contaminated soil stockpile at Natara Global Hartlepool site
5,000 tonnes soils stockpile

RELATED CASE STUDIES

Solar PV Installation – East Northants Resource Management Facility (ENRMF)

Clean up of foam filled warehouse

Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

contaminated land at Natara Global Hartlepool site

Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

New site set up for residue of APCr in Scotland

Setting up a new EFW site and transport for residue waste (APCr) in Scotland

Get in touch with our experts

Call us on 0333 034 9004 or 

Call us on
0333 034 9004 or

Contact Our Press & Media Team

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

GET IN TOUCH

CALL 0333 034 9004

Contact us about Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

Contact Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

Please include any relevant files or documents.
Max 5Mb / 5 attachments.