Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

Project Overview

Augean was engaged by our client after initial testing revealed elevated levels of PAHs in the silt adjacent to their dock.

Our technical team reviewed these results, which were deemed insufficient for land disposal, prompting further sampling and testing at our UKAS-accredited laboratory in Peterborough.  The additional data enabled proper classification of the silt in accordance with WM3 guidance, ensuring regulatory compliance.

Due to the contamination levels and the proximity to the dock, a crane was required to safely dredge the material from depth. Augean mobilised this equipment within two weeks, utilising our extensive supply chain to meet the client’s deadlines.

A temporary bund was constructed using imported material to contain the dredged silt prior to loading onto sealed 8-wheel tippers. The excavated material was transported to our Port Clarence facility, where it was deposited into a purpose-built dredgings lagoon for treatment alongside other waste.

The treated material was then reused in our on-site engineering works. Upon project completion, the client received a compliance pack containing weekly tonnage reports, documentation, and weighbridge tickets, ensuring all regulatory and environmental requirements were satisfied.

The solution

Augean demonstrated our capacity to deliver comprehensive turnkey solutions to the dredging market. By leveraging our extensive supply chain, expert project management, and advanced treatment infrastructure, we provided the client with a seamless, all-in-one service for their dredging needs, ensuring efficiency and compliance throughout the project.

Augean demonstrated our capacity to deliver comprehensive turnkey solutions to the dredging market. By leveraging our extensive supply chain, expert project management, and advanced treatment infrastructure, we provided the client with a seamless, all-in-one service for their dredging needs, ensuring efficiency and compliance throughout the project.

Project Details

Project Name: Testing, excavation, transport, treatment and disposal of contaminated river dredgings

Volume: 3,000 tones

Project Scope: Excavate 3,000 tonnes of contaminated river dredgings to clear access to a dry dock. This included the formation of a temporary bunded storage area port side and treatment of contaminated dredgings at our Port Clarence Facility.

Project Highlights

  • Excavate 3,000 tonnes of dredgings via a crawler crane.

  • Formation of temporary storage area.

  • Transport of wet dredgings utilising sealed tippers.

  • Treatment and disposal of dredgings at our Port Clarence treatment facility.

RELATED CASE STUDIES

Solar PV Installation – East Northants Resource Management Facility (ENRMF)

Clean up of foam filled warehouse

Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

contaminated land at Natara Global Hartlepool site

Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

New site set up for residue of APCr in Scotland

Setting up a new EFW site and transport for residue waste (APCr) in Scotland

Get in touch with our experts

Call us on 0333 034 9004 or 

Call us on
0333 034 9004 or

Contact Our Press & Media Team

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

GET IN TOUCH

CALL 0333 034 9004

Contact us about Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

Contact Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

Please include any relevant files or documents.
Max 5Mb / 5 attachments.