Contaminated Soil Removal

Over 40,000 Tonnes Of Hazardous Contaminated Soils Removed From Site Over A 4-Month Period

Project Description

Between July and to end of October 2023, Augean arranged the storage, treatment, recovery and disposal of around 40,000 tonnes of hazardous contaminated soils from a site in Scotland. Over a four-month period, the material was transported by our client with Augean assisting with coordinating transport movements to our Port Clarence Treatment Facility. The hazardous soils were contaminated with hydrocarbons and high pH. Augean’s treatment team presented the best segregation of contaminants to reduce overall treatment costs and were able to provide treatment options for all levels of contamination at the same facility. Once treated, the material was recovered or disposed at our Port Clarence site, providing a cradle-to-grave solution.

Both volume and contamination of material meant strict deadlines were required by the client to remove and treat large volumes daily.

Our client’s and Augean’s teams coordinated the transportation of up to 1,000 tonnes daily to cover the high volume of hazardous contaminated soils movements required by our client. This allowed our Port Clarence operations team to respond to the challenge by actioning additional requirements for volume acceptance on site
for treatment.

Augean provided the client with all the relevant compliance documentation giving a daily tonnage report to ensure they were able to track the project’s progress closely. All of the material was treated and diverted from direct landfill disposal, achieving significant cost savings and following the waste hierarchy.

This scheme was a key example of Augean’s high level
of customer service and ability to transport, treat, recover and dispose of the UK’s hard to handle wastes.

Augean worked closely with the client to ensure we could successfully accept a large number of deliveries over four months of over 40,000 tonnes of hazardous contaminated soils.

Project Overview

Client: Development of a new EfW plant near Glasgow

Project Name: Site preparation for development in Scotland

Volume: 40,000 tonnes of hazardous contaminated soils

Project Scope: Storage, treatment, recovery & disposal

Project Highlights:

  • Augean assisted with coordinating a
    high volume of daily HGV movements
  • Augean provided treatment options
    for all levels of contamination at the
    same facility
  • Augean ensured transparency with all the relevant compliance documentation and daily tonnage reporting

RELATED CASE STUDIES

Solar PV Installation – East Northants Resource Management Facility (ENRMF)

Clean up of foam filled warehouse

Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

contaminated land at Natara Global Hartlepool site

Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

New site set up for residue of APCr in Scotland

Setting up a new EFW site and transport for residue waste (APCr) in Scotland

Get in touch with our experts

Call us on 0333 034 9004 or 

Call us on
0333 034 9004 or

Contact Our Press & Media Team

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

GET IN TOUCH

CALL 0333 034 9004

Contact us about Contaminated Soil Removal

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

Contact Contaminated Soil Removal

Please include any relevant files or documents.
Max 5Mb / 5 attachments.