Sellafield: Trial Specification (Non-Man Entry Method)

Project Background

Future Industrial Services (FIS) were contacted by Sellafield to submit a quotation for a trial regarding a potential project to displace a contaminated FLOC and residual waste from the active tank. The scope required the material to be efficiently transported 15 metres vertically using a non-man entry “Gerotto” Remote Operated Vehicle (ROV) method supported by specific equipment.

Delivery Proposal

The trial was carried out to prove the method is suitable and to give information around the duration of the potential work on site.

A scaffold tower was erected at the FIS depot in Hull. This acted as the operations floor with an opening of 1200mm (diameter) to mirror the openings of the onsite tanks. The scaffolding was at a height of 15m, to mirror the tanks on Sellafield which are 15m below ground, and the ROV would be lowered in from above.

The aggregate ranged from Type 1, pea gravel and a sand, mixed with a flocculant to replicate what’s in the tanks on Sellafield, and placed in a contained area at the base of the scaffolding.

A 16m3 liquid ring vacuum tanker was stationed beside the scaffold tower. A Zone 1 control station (shipping container) was placed within 100 metres of the scaffold. The vacuum hose from the tanker was connected to the ROV prior to entry. The umbilical was connected from the control room to the ROV prior to entry.

The ROV was lowered down from the top of the scaffolding towards the base and began agitating and removing the aggregate and flocculant.

The trial was recorded inside the tank by the ROV and also recorded externally over the duration. A report was compiled and issued to Sellafield with recommendations, lessons learned, % efficiency of materials that were displaced and anticipated duration for the project.

The FIS technical team was on hand throughout the trial to offer knowledge and experience required to improve performance. Additional equipment and accessories for the ROV were onsite and available throughout the trial.

Drawing of scaffold at Sellafield with Future Industrial Services
Demonstration of scaffold set up,
aggregate and ROV being lowered
Future Industrial Services storage of equipment

Support & Capability

  • We offer various services to the Nuclear and Radioactive industry, including metal decontamination and recycling, sorting and segregating and disposal. This case study demonstrates how our Specialist Industrial Services teams support these efforts.
  • Providing Specialist Industrial Services for over 25 years, Future Industrial Services (FIS) have vast knowledge, expertise and experience of delivering specialist cleaning projects.
  • Through the recent investment of a non-man entry Zone 0 ROV, FIS is offering alternative options for cleaning requirements.
  • The non-man entry Zone 0 ROV is fully supported with Atex Zone 1 mobile equipment container and control station with Zone 0 100m umbilical.
Operator monitoring electronic displays
FIS technical team monitoring
Industrial Service team monitoring equipment and work
ROV trial in progress

RELATED CASE STUDIES

Solar PV Installation – East Northants Resource Management Facility (ENRMF)

Clean up of foam filled warehouse

Dredging of river dock – testing, excavation, transport, treatment and disposal of contaminated river dredgings 

contaminated land at Natara Global Hartlepool site

Treatment and disposal of over 5,000 tonnes of hazardous material in preparation for future projects

New site set up for residue of APCr in Scotland

Setting up a new EFW site and transport for residue waste (APCr) in Scotland

Get in touch with our experts

Call us on 0333 034 9004 or 

Call us on
0333 034 9004 or

Contact Our Press & Media Team

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

GET IN TOUCH

CALL 0333 034 9004

Contact us about Sellafield: Trial Specification (Non-Man Entry Method)

Please include any relevant files or documents.
Max 5Mb / 5 attachments.

Contact Sellafield: Trial Specification (Non-Man Entry Method)

Please include any relevant files or documents.
Max 5Mb / 5 attachments.